Included in the Home Package-Kit
Basement/walk-out walls
Floor structure/system
Exterior walls
Exterior decks & rails
Energy Star Windows & doors
Insulation Package
Roof Trusses and roofing
Interior doors and trims
Basement/walk-out walls
(INCLUDING DIVISION WALLS) 9’
- Siding of your choice
- 1/3 strapping
- SM 1: 3/4: R-7.5 7/14 OSB sheating
- 2×6 KD studs
- R-22 insulation
Floor structure/system
FOR MAIN & SECOND FLOOR
- Adjustable column as per plan, All LVL, Microllam & Parallam
- Steel beams as per plans (if applicable)
- 3/4″ OSB Edge Gold floor sheathing
- Open joist or TJI floor system
Exterior walls
(INCLUDING INTERIOR DIVISION WALLS) 10’
- Siding of your choice c/w trims
- 1” x 3” strapping
- SM 1-3/4” (R-7.5)
- 7/16” OSB sheathing (Aspenite)
- 2” x 6” KD studs
- Fiberglass insulation
- 6 mil. Poly Vapor Barrier
- 1” x 3” strapping
Exterior decks & rails
Energy Star Windows & doors
Insulation Package
- Including installation
Roof Trusses and roofing
- Life Time Roofing Shingles
- 1/2″ plywood
- Flat ceilings R-60 Insulation, Sloped ceilings R-32 insulation
- Pre-engineer roof trusses
Interior doors and trims
- Interior trims including interior doors
- All window and door trims
- Pre-Hung & Custom Doors
Options
Non Structural hybrid Timber
Structural post & beam floor
HWF & Tiles
Kitchen cabinets, Vanities and Countertops
Not Included in the Home Package-Kit
- All installation of items in kit
- All trades and vendors work-contracts
- Finish Basement
- Caulking
- Chimney cap
- Custom Shower
- Door knobs and locks
- Drywall
- Fireplaces
- Floor covering
- Foundation
- Framing
- Electrical
- Heating system
- Hot water tank
- HRV
- Interior stairs & rails
- Lighting fixtures
- Kitchen cabinets and vanities
- Shelves & Poles
- Plumbing
- Plumbing fixtures
- Site prep
- Excavation
- Tile & Ceramic
- Well & septic system
- Surveyors & septic engineer
- Permits
- Masonry
- Cultured stone and Stucco.